Java Code For Critical Path Method
Java Programs for EVE Online v.2.1.0
Java based programs for eve-online ...
JEPlus - Java shell for E+ parametrics v.1.3.beta
Parametric analysis is often needed for exploring design options, especially when a global optimization method is not available, or the optimization result is in doubt. Parametric analysis can also be applied to all design variables simultaneously, which ...
FlatPack Java API For Flat Files v.3.2.0
Simple Java delimited and fixed width file parser. Handles CSV, Excel CSV, Tab, Pipe delimiters, just to name a few. Maps column positions in the file to user friendly names via XML. See "FlatPack Feature List" under News for complete feature list.
JSkeleton, java code skeleton generator v.0.98
JSkeleton is a swing based java application which generates skeleton java sourcefiles from a forms based gui interface. Accessor ( get and set ) methods areautomatically created for variables specified by the user.
SQL to Java Code Generator v.2.6.7
SQL2JAVA is a SIMPLE, PRAGMATIC and POWERFUL code GENERATOR.It maps any relational schema to a java API dedicated to access your database schema. It supports Oracle, SQLServer, PostgreSQL, MySQL, Sybase, HSQL, etc...2 minutes to install/try...
A Java library for reading/writing Excel v.2.6.12
JExcelApi is a java library which provides the ability to read, write, and modify Microsoft Excel spreadsheets. This project mirrors the files on http://www.jexcelapi.org, which has been known to go down on occasion.
Gumbo - Patterns and code for 2D/3D apps v.30918
Expands on the code from the book "3D User Interfaces with Java 3D", and includes a generous contribution of RCP code from Meyer Sound.
Java FTP for Integration v.1.0
JFTP4I is a Java FTP Framework that dinamically calls an user implemented class on each client request. When the user makes a request to a file, the framework automatically uses the configuration XMLs to start an event to deal with the data requested.
JEnsembl: a Java API for Ensembl v.1.10
A prototype Java API to the Ensembl data system ...
JGame - a Java engine for 2D games v.20110425
It runs on the Java JRE 1.3+ platform, the J2ME (MIDP2.0/CLDC1.1) mobile platform, and the Android (2.1+) platform. It provides a very high-level framework for "classic" type arcade games.
Jk3d v.1.0
jk3d is a java code for 3d interpolation of scattered data. jk3d uses a quality weighted ordinary Kriging method and optional an inverse distances weighting method. It has no graphical user interface and uses ASCII files to define the input.
Daoxgen v.1.0
Data Access Object XML-based Generator is a tool for automatic generation of Java code for the data layer. It imports a database schema and generates DAO classes for single or multiple tables. It stores the schema and user-defined classes as XML.
RationalPlan Single Project for Mac v.4.15.0
The application is an affordable alternative to Microsoft Project and it is covering project management area from WBS construction, project planning and scheduling to critical path management, overallocated resources detection, progress tracking, ...
RationalPlan Single Project for Linux v.4.13.0
The application is an affordable alternative to Microsoft Project and it is covering project management area from WBS construction, project planning and scheduling to critical path management, overallocated resources detection, progress tracking, ...
YahooListCreator v.1 1
Introduction-This is a small application, when run this downloads list of most recently traded stocks from NSE and BSE and generates valid yahoo stock code for NSE and BSE stocks. Requirements-This is written in java and requires jre1.5.0_09 or above.